| Prebuild Centre |
|
|
|
Pre-build & Configuration Centre · Pre-Installation of Options into Servers/Storage to vendor standards · Power on Self Test to check all components are present - this does not perform a functional test of every component. · Re-generation of part number/serial number sheets to include fitted Options · Optional Asset tagging of hardware - we provide asset number/serial number information via email after build. · Optional Host name labelling on Systems · Hardware Pre-build as above. · Updating of all Hardware Firmware to Vendor Standards. · Optional Verification Test suite Component Soak test (1hr - 24hr) · Latest Version installation only to pre-defined build parameters. · User will be prompted for site specific information. ie hostname, IP address when the server is next switched on. · Racking of Hardware to customer pre-defined layout. · Cabling of Power cables from PDUs to hardware. (NO ethernet, fibre or SCSI cabling) · Secure bonded storage of hardware · Custom pre-build of Operating System using bespoke build document from customer · Ethernet, Fibre and SCSI Cabling within Racking Service · Labelling of connections For more detailed information on Computergate Professional Services please call on 1300 137585.
|
||||



